Product Series
Contact Us
Phone/WeChat:
Email:
Address:No.2, Qingyuan South Road, Langli Street, Changsha County, Changsha City
Product Center
Solve the problem of high pressure and high wear in the delivery of commercial concrete by pump trucks.
Solve the problem of high pressure and high wear in the delivery of commercial concrete by pump trucks.
Solve the problem of high pressure and high wear in the delivery of commercial concrete by pump trucks.
It is a material conveying process that forms between the initial feeding point and the final unloading point on the conveyor line for bulk materials.
Die-casting integral integral wear-resistant ceramic pipe
It utilizes the energy of airflow to transport granular materials along the direction of airflow in a closed pipeline